Diego went from $30–40K/month to $80–90K/month. 521 exclusive homeowner requests. A concrete division launched and already producing.
Every project below came through SmartClips' exclusive pipeline. Diego was the only contractor in Charlotte with access to each homeowner at the time of enquiry.
Quoted at $34,000. Diego did a 3D design walkthrough showing Delton what was actually possible. A month later Delton came back with a bigger vision. Final invoice: close to $68,000.
$40,259. Landed in January — Diego's historically slowest month. The project lasted the entire month. "That really held our company afloat during that time."
These are real Google reviews left by homeowners who came through SmartClips' exclusive pipeline — then booked DLopez Landscaping and shared their experience publicly.
12 months. 521 exclusive requests. $550K closed. $1.4M still in negotiation. Here's the data.
DLopez Landscaping was doing $30–40K/month and usually had about one to two weeks of pipeline ahead. Good crew. Good work. No reliable system to forecast or fill the calendar.
Diego had fielded plenty of pitches. What was different: Moe showed him the backend. The qualification engine. The disqualification criteria. The exclusivity clause in writing.
SmartClips pre-qualifies every homeowner before Diego ever sees the request. Budget confirmed. Timeline confirmed. In service area. Diego is the only contractor in Charlotte receiving that specific request. That's why $550K is possible in one year from one channel.
521 exclusive requests sent to Diego — no other Charlotte contractor sees the same homeowner
Every homeowner SmartClips sends to Diego has already confirmed: project timeline, minimum budget, in-service-area. If they don't meet the minimum spend, they never reach Diego.
Diego didn't overhaul the business. He changed who he was talking to. Pre-qualified homeowners with confirmed budgets of $25–30K+ replaced the old cycle of chasing quotes. The average ticket jumped. Revenue followed.
Delton: Started as a $34K quote. Diego did a 3D design walkthrough. A month later Delton came back and grew the scope to $68,000.
Andy N.: $40,259 paver patio landed in January — Diego's slowest month. "That really held our company afloat during that time."
Igal: $31,330 concrete job. Closed 63 hours and 13 minutes after the lead came in.
Laura S. & Tim B.: $19,393 and $18,684 respectively. Both left 5-star Google reviews with project photos.
With the mobile app, Diego can see every incoming request, respond to clients, and keep the pipeline moving — even when he's not in Charlotte.
The first interview from the early months of the partnership — the $12,000 first job in 5 days, the Charlotte market breakdown, why Diego said yes. The 1-year interview above shows how far things have come since.
Real numbers, real partners — running active cities right now.

Over $1.2M in jobs in the first 5 months of the partnership.

$187,500 in 5 weeks — and booked out through December.

Went from $4,000/month to over $225,000/month.

Dallas market. 7,100+ competitors. $390K in estimates in a single November.
Real results, real stories — from contractors who locked down their city and never looked back.
Book a 20-minute call with Moe. We'll check if your city is open, walk you through the system, and show you exactly what exclusivity looks like in your market.